Project Presentation
complete Projects
SID: | 016 |
Date: | 2015 |
Project: | Supply of Acid proof Tiles |
Client: | Magnus Power Private Ltd. |
Details: | Supply of Acid proof Tiles |
Project file | untitled-1.pdf - Download |
SID: | 01 |
Date: | 2009 |
Project: | Power Pack Mutiara Keraniganj Power Plant Ltd. |
Client: | Power Pack Mutiara Keraniganj Power Plant Ltd. |
Details: | Electrical Erection,Testing Commissioning |
| |
SID: | 02 |
Date: | 2013 |
Project: | Supply & System Installation in Sylhet |
Client: | Basic Engineering Ltd. |
Details: | Supply & System Installation in Sylhet (Solar panel, M.S pipe, Lead acid Battery Etc.) |
| |
SID: | 03 |
Date: | 2015 |
Project: | Supply Of Electrical Equipment for Power Plant |
Client: | Magnus Power Private Ltd. |
Details: | Supply Of Electrical Equipment for Power Plant Project |
| |
SID: | 04 |
Date: | 2009 |
Project: | 13233 KV Barapukuria,Rangpur,Syedpur Substation |
Client: | ABB Sweden |
Details: | Erection-Commissioning Electrical & Mechanical Work |
| |
SID: | 05 |
Date: | 2011 |
Project: | Renovation work of 3311KV substation |
Client: | Kabir Steel Re-rolling Mills Ltd. |
Details: | Renovation work of 33\11KV substation (Erection,Installation, & Connection of Switchgear) |
| |
SID: | 06 |
Date: | 2013 |
Project: | R.C.C Industrial Building |
Client: | Dada (Dhaka) Ltd. |
Details: | Construction for a 4 story R.C.C Industrial Building With a foundation of 7 story Super Structure |
| |
SID: | 07 |
Date: | 2014 |
Project: | Supply of Materials, Transportation up to site & Installation Of Earthling works for 108MW Gas fired IPP Power Plant at Gorasal,Narsindhi |
Client: | Regent Energy & Power Ltd. |
Details: | Supply of Materials, Transportation up to site & Installation Of Earthling works |
| |
SID: | 08 |
Date: | 2010 |
Project: | Panchagar 132/33 KV Substation & 132/33 KV Substation Noagaon & Thakurgaon |
Client: | Sub-Contractor |
Details: | Construction, Mechanical & Erection Work |
| |
SID: | 09 |
Date: | 2007 |
Project: | Repair Of 11kv Overhead line & Transformer Replacement |
Client: | Dhaka Electric Supply Authority |
Details: | Repair Of 11kv Overhead line & Transformer in Sadarghat,Dhaka |
| |
SID: | 010 |
Date: | 2006 |
Project: | Repair Of 11kv Overhead line & Transformer Replacement |
Client: | Dhaka Electric Supply Authority |
Details: | Repair Of 11kv Overhead line & Transformer Replacement Repair Of 11kv Overhead line & Transformer in Lalbagh,Dhaka |
| |
SID: | 011 |
Date: | 2011 |
Project: | Construction Of 132 KV Transmission Line Project with Polygonal Steel Poles For Noapara 132 kv Sub-station |
Client: | Power Grid Company Of Bangladesh Ltd |
Details: | All Civil,Stringing,Testing,& Commissioning Work |
| |
SID: | 012 |
Date: | 2011 |
Project: | 132 KV Inter-connection Transmission line Between 100 MW Dutch Bangla Power Plant to existing Siddhirganj 13233 KV Sub-station |
Client: | Power Grid Company Of Bangladesh Ltd |
Details: | All Civil,Stringing,Testing,& Commissioning Work |
| |
SID: | 013 |
Date: | 2011 |
Project: | Netrokona Grid Sub-Station 2533 MVA |
Client: | Power Grid Company Of Bangladesh Ltd |
Details: | All Civil,Stringing,Testing,& Commissioning Work |
| |
SID: | 014 |
Date: | 2014 |
Project: | 142 nos. piling work for 108MW Power Plant Project at Bosila,Keraniganj |
Client: | CLC Power Co. Ltd. |
Details: | Supply of Electrical Equipment |
| |
SID: | 015 |
Date: | 2012 |
Project: | Handling & pulling & Alignment Of Generator |
Client: | RZ Power Ltd. |
Details: | Handling & pulling & Alignment Of Generator Workshop |
| |
SID: | 016 |
Date: | 2015 |
Project: | Supply of Acid proof Tiles |
Client: | Magnus Power Private Ltd. |
Details: | Supply of Acid proof Tiles |
| |
SID: | 018 |
Date: | 2011 |
Project: | 132 Kv 1.2Km Transmission line For power Evacuation Doudkandi |
Client: | Power Grid Company Of Bangladesh Ltd. |
Details: | All Civil,Stringing,Testing,& Commissioning Work |
| |
SID: | 019 |
Date: | 2009 |
Project: | Maniknagar-Narindha 132 KV pressurized Underground Cable Construction |
Client: | Dhaka Power Distribution Company Ltd. |
Details: | Underground Cable Construction & repair
|
| |
SID: | 020 |
Date: | 2010 |
Project: | Construction Of 230132 KV sub-Station & Transmission Line Project at Hasnabad,Dhaka |
Client: | Power Grid Company Of Bangladesh Ltd |
Details: | All Civil,Stringing,Testing,& Commissioning Work
|
| |
SID: | 021 |
Date: | 2011 |
Project: | 11 MW Power Plant Project At Feni |
Client: | Doreen Power Generations & systems Ltd. |
Details: | Construction of Power House & Machineries Foundation, Ancillary Buildings, Internal Roads & Boundary Wall
|
| |
SID: | 103 |
Date: | 24-01-2019 |
Project: | Installation of one set Isolator and one set PT in the 132 KV Main Bus of 132/33 KV Chowmuhoni Grid Substation under GMD PGCB Cumilla |
Client: | Power Grid Company Of Bangladesh Ltd. |
Details: | |
Project file | work_orded_chowmuhani_(ct,_pt).pdf - Download |
SID: | 102 |
Date: | 2019-05-24 |
Project: | Carrying, Installation, testing and commissioning work of 132/33kV, 25/41MVA Transformer from Madunaghat to Juldha Grid Substation under GMD, Chattogram (Central), PGCB. |
Client: | Power Grid Company of Bangladesh Ltd. |
Details: | |
Project file | transformer_caring-2.pdf - Download |
SID: | 101 |
Date: | 17-05-2019 |
Project: | Carrying, Installation, testing and commissioning work of 132/33kV, 25/41MVA Transformer from Madunaghat to Juldha Grid Substation under GMD, Chattogram (Central), PGCB. |
Client: | Power Grid Company of Bangladesh Ltd. |
Details: | |
Project file | transformer_caring-1.pdf - Download |
Showing page 1 of 1 pages